INDUSTRIAL BUILDING REPAIR
This was a challenging repair. Straight line winds tore open the feed tower on this facility. Another building was built in front of the tower blocking access with man lifts, so we had to hire a crane service with a man basket. Then we went to work untangling the twisted red iron and metal, installed new red iron girts, bracing, insulation, and metal siding. We accomplished this in the heat of July as quickly as possible, but most importantly, Safely!
Thanks for watching! Stay safe out there, and have a great day.